03 February 2008

Down at Damon's




1-2 FEBRUARY 2008
I headed down through the non-existent forecasted blizzards on Thursday night to Damon's place outside Kelso. Friday was spent in the freezing, un-heated (till 4pm) new hoose. Damon was Mr DIY personified, while I managed some manual labouring (of sorts) for him and varnished a few doors. I also made the tea. On Sat morning Damon and I enjoyed a cracking 77 min run in the snow covered hills near Morebattle, before he had to go childminding. I headed off and managed a lovely 3h 40m run along the St Cuthbert's Way from Maxton to the top of the Eildons at Melrose and back again.

Friday's Blog reports =
Today we mostly drank tea. And in between the blizzards JD plumbed in the central heating system, hung a few doors, cut and fitted the sink in the utility room and generally showed off his amazing DIY skills. I mostly danced all day to the groovy sounds of the Dixie Chicks, Michael McGoldrick and Show of Hands. Jim the plumber stopped the CO2 from poisoning us all and the neighbours rode in through the saloon doors on their Clydesdale horses to borrow a bag of sugar. Anna painted a few muriels (I think he means murals - ed) of flying ducks on the wall and then dashed off to save the twins from the mighty blizzard that was sweeping through the metropolis of Morebattle. JD bravely tested out the WCs in every room and judged them nae bad. Fuelled by peanut butter and cheese pieces at lunch we then ran 26 miles home over the Cheviots in time for a BBQ and some midnight trampolining. JD is back off to the smoke tomorrow and I don't know how I'll cope.

As you may have guessed, JD wrote that lot! Big, big day, when the disaster of yesterday was dispelled. My fix for the central heating worked an absolute treat, and by mid-morning I had all the radiators connected, with just a couple of very slow drips for which I needed a roll of PTFE tape. Jim had filched it all, so they had to wait until he rocked up at 4pm. In the meantime JD and Anna varnished a load of the internal doors (and pretty nifty they look, too) and JD and I cut the utility-room worktop and assembled it all.
Jim commissioned the boiler and did the CO2 test, and by the time we all left a little after 5pm, the place was almost approaching warm. What a difference - it's really starting to feel like a home!
The floor is continuing to dry slowly, and I think, but can't be sure, that the bumpy floor is starting to flatten a little as the swollen joints shrink back.

Photos
Damon's Self-build Blog

No comments:

Post a Comment